Table of contents
Open Table of contents
Why publish the backlog?
The field notes leave some numbers unresolved on purpose. This page is that list.
The questions come from comments on the Farzad tour, from watching the same material, and from follow-up reading that did not settle the point.
Related: field notes
High priority
| ID | Question | Status | Why it matters |
|---|---|---|---|
| Q1 | Authoritative passenger + station counts right now? | open | Official pages disagree (3M/8 vs 4M/11) |
| Q9 | Public map of tunnels/stations (built vs approved)? | partial | Hotlinked official figures on the field notes. No single public PDF of the full network. |
| Q10 | Clipping / easements under private land (NV + TN)? | partial | The company has an easement FAQ. The statutes are still open. |
| Q7 | Evacuation / breakdown procedures in a blocked tunnel? | open | Top comment concern |
| Q14 | Fire hydrants, smoke fans, Fire Marshal control — primary docs? | open | Safety credibility |
| Q20 | Primary confirmation of Harry Reid drop-off/pickup status? | open | Secondary LVRJ ~Dec 2025 limited drop-offs; do not over-claim “airport is live” |
Engineering / ops
| ID | Question |
|---|---|
| Q2 | Measured Prufrock advance rate (not 1 mi/week target)? |
| Q3 | Has <$8–10M/mile been achieved on a completed segment? |
| Q11 | Conveyor belt lifetime, failure modes, recovery teams? |
| Q12 | Spoil: truckloads vs tonnage; % into liners? |
| Q13 | Vehicle dispatch: central control vs simple signaling? FSD mods for tunnels? |
| Q15 | Real TBM cost (tour ~$1M at ~56:00 — likely needs verify)? |
| Q16 | Large multi-tunnel stations: cut-and-cover vs mined? |
Product / stations
| ID | Question | Status |
|---|---|---|
| Q8 | How many annex stations; how do riders experience them? | open |
| Q19 | Why “Loop” if maps are not circles? (branding / network / twin tunnels — no definitive quote) | partial |
| — | “Taco shop station” — surface twice, or annex drive-in? | open |
| — | Small drop-off: lift room vs portal to surface parking? | open |
| — | All tunnels bidirectional? Cross-passage spacing? | open |
Business / dual-use (speculative)
| ID | Question |
|---|---|
| Q4 | Music City Loop “privately funded” — who pays what? |
| Q17 | Do they sell utility capacity in tunnels (power, water, data, other)? |
| — | Water/sewer/oil dual-use — policy reality vs thought experiment |
Maps and the airport
The contrast worth keeping is in the field notes: Nashville’s airport is part of the first design; Vegas started with hotels, and the airport status was layered on later.
Still open on purpose
A question stays here until a primary source answers it. A comment or a secondary article can suggest a lead. It does not close the question by itself.